Identifier
HBRC 00050:1:12
Descriptive Note
Length: 46m. Summary: Bola 88: 0-13m – cleaning up stopbanks and rebuilding stopbanks; 13m- Ngarurora river damage after Cyclone Bola; 16m- Upgrading Havelock North streams; 20 to 46m – Maintenance : shunting Railway irons in to ground by machine. Spraying beside creeks and streams; Weed boat in action and a lot more machinery which is used to keep waterways clear from the elements.
Has beginning date
1987
Has end date
1988
Linked Agent
created by (RiC-R027): Hawke's Bay Catchment Board and Regional Water Board
Content Type
Included in
Location
Has location
Archives Central
Series No
HBRC 00050
Box No
1
Item No
12
Model
Record (RiC-E04)