Puninga Pump Station, 11/05/1989

Identifier
HBRC 00050:1:6
Descriptive Note

Length: 1·51 mins. Summary: This is a bulk tape showing how the station was built, the machinery used to dig the huge holes to laying the pipes and massive pre-cast concrete divisions that match up perfectly together. Cranes being a very important part of this whole complex job.

Has beginning date
1989
Has end date
1989
Linked Agent
Content Type
Included in

Location

Has location
Archives Central
Series No
HBRC 00050
Box No
1
Item No
6
Other identifiers
Legacy identifier
20150605/1004
af892add-a638-468f-adc9-abd0928a759f
Model
Record (RiC-E04)