Fitzherbert Bridge Construction

Identifier
PNCC 4/10/1
Descriptive Note

Log book and pile driving sheets kept by J E Menzies the resident engineer who supervised the construction of the second bridge across the Manawatu River at the end of Fitzherbert Avenue (1933 – 1935). For engineering correspondence files, see series 4/3/5

Has beginning date
1933
Has end date
1935
Has location
Ian Matheson City Archives
Record Set Type
Series
Model
Collection
c24dd033-b858-40ff-8e72-0a1664ac61bb

Records in

Displaying 1 - 2 of 2